
The Best P6 and OPC Alternative for Modernizing Scheduling



Why are top construction teams choosing Planera over P6 and OPC?
Planera vs. P6/OPC: what's the difference?


COO, Big D Construction

Built for modern construction teams

Real-time team collaboration

AI-Powered Scheduling - The First of Its Kind
World-class support

We will meet you wherever you are
Planera imports your existing P6 schedules in minutes and integrates natively with Procore and Autodesk Construction Cloud.


Frequently Asked Questions
To help you make an informed decision, we've compiled some of the most commonly asked questions.
How is Planera different from P6 and OPC?
P6 and OPC are robust CPM tools, but they were not designed for construction - they originated in engineering and manufacturing. Their interfaces are rigid, complex, and unapproachable for field teams.
Planera is purpose-built for construction: visual, collaborative, easy to use, and CPM-based. It brings field and office teams onto the same planning page while improving scheduling acumen across the project team.
Can Planera handle complex CPM logic?
Yes. Planera supports full CPM scheduling with predecessor/successor relationships, multiple calendars, constraints, lag/lead, and float calculations. If you can build it in P6, you can build it in Planera.
Our specs mandate P6. Can we use Planera instead?
Many contracts mention P6 by name, but that is often because P6 was the only option when the spec was written. Most contracts require CPM capabilities, a P6 file type deliverable, and outline a list of required functions. Planera meets these requirements and offers a better user experience for the entire project team.
Review your specs closely - most require CPM compliance, not a specific vendor.
Are our teams actually planning in P6, or just reporting into it?
This is the question that matters most. Most GCs use P6 or OPC as a reporting and compliance tool, not a true planning environment. The disconnect between the master schedule and the tools used for day-to-day planning introduces risk and inefficiency. Planera closes that gap by making the schedule the actual planning tool.
What about transitioning from P6 to OPC?
P6 is being sunset, and OPC's steep learning curve means retraining your entire team. General contractors we speak with report that OPC's real-time collaboration fails to deliver on its promise.
Basic functions like copy/paste do not work reliably. Rather than investing in a painful OPC transition, Planera offers a much easier, more reliable path forward.
When multiple team members need to work in the schedule, how do you prevent conflicts?
P6 does not support real-time collaboration or user awareness, making multi-user edits risky and opaque. OPC claims to support it, but the reality falls short. Planera's real-time multiplayer editing means everyone works in the same live schedule with full visibility into what others are doing.
How many users can I have with Planera?
Our pricing includes unlimited users. No per-seat fees, ever. Add as many users as you need.

